- Al Kennedy High School
- Parent/Guardian Resources
Parent/Guardian Resources
-
Annual Asbestos Notification
ANNUAL NOTICE OF ASBESTOS PROGRAM ACTIVITIES
The South Lane School District continues to pursue a program for asbestos management that was developed in 1988 to satisfy a federal mandate, which is enforced by the State of Oregon.
The Federal Asbestos Hazard Emergency Response Act (AHERA) required an initial inspection for friable (more easily released) and non-friable asbestos. The District hired a qualified, independent contractor to inspect all areas of all district facilities. The inspection was completed on October 1, 1988, and the results were included in a management plan written by an accredited management planner. The plan, submitted to the Department of Education, also included a maintenance program to repair, remove, enclose or manage asbestos and asbestos containing materials wherever present in the District.
The goal of the SLSD Asbestos Management Plan is to comply with the AHERA guidelines and ensure that our school buildings remain safe and free from asbestos hazards. The ongoing management plan required by AHERA includes twice-annual inspections at all locations where materials containing asbestos are known to be present. Any necessary actions or changes in the condition of such materials are then noted in the Asbestos Management Plan for each location.
A certified consultant from PBS Engineering and Environmental performed the required AHERA 3-year re-inspection in July 2024. The next re-inspection will take place in summer 2027. Asbestos abatement projects completed in July 2024 at Lincoln Middle School by Pacific Environmental Group include removal of 5 (five) asbestos-containing hard fittings and 40 lin. ft. of fiberglass pipe insulation from the boiler room and removal of 4 (four) asbestos-containing hard fittings at specific designated locations in the main tunnel. All abatement was in nonstudent access areas.
SLSD maintenance and custodial employees receive initial and continuing training regarding AHERA and asbestos management. The District may contract with a licensed contractor to perform required work or training in accordance with the AHERA program.
A complete Asbestos Management Plan is available for review at each school office or the South Lane School District Service Center. These plans include all inspection reports with analysis, and a record of all management or maintenance actions taken on asbestos-containing materials. The plans can be reviewed during normal business hours.
-
Sign up for Remind Messages
South Lane School District and Al Kennedy High School use the Remind App to communicate with parents/guardians and students. When you sign up for Remind you can select to receive text messages for emails from Al Kennedy High School to get information about what is happening at school and to communicate directly with school staff.
-
Sign Up for Flash Alerts
Flash Alerts will send you a text message or an email when school closures are happening. Get signed up so that you can have up-to-date information about school closures.
-
23-24 Student Handbook
-
Care Request Form
If your student needs support from a member of our care team including our Social Emotional Learning Coach, Community Care Specialist, Attendance Secretary, Office Manager or Principal, please complete a care request so we can set up a time to help your student.